Skip to content
Snippets Groups Projects
Commit 73328142 authored by Teo Serra's avatar Teo Serra
Browse files

Update project page - tasks & schedule

parent 2bf84053
Branches
No related tags found
No related merge requests found
Pipeline #449497 passed
......@@ -303,29 +303,67 @@ in a schedule starting from the Midterm.
### Tasks Definition
Tasks are broken down by function.
Tasks are divided by devices (HV Generator & Plasma Reactor).
#### HV Generator
The tasks concerning the high-voltage generator are defined below.
- [x] task 1
*Add tasks*
* [ ] Design of the PCB
* [ ] Inverter
* [ ] Output Devices (OLED screen)
* [ ] Intput Devices (temp sensor, CO2 sensor ?)
* [ ] Manufacture the PCB & Components soldering
* [ ] Testing the PCB
* [ ] Testing inverter - low voltage generation
* [ ] Testing output device
* [ ] Testing input devices
* [ ] Testing HV Generator
* [ ] Testing connections
* [ ] Testing high-voltage generation
* [ ] Design of the HV Generator
* [ ] Design casing & PCB support
* [ ] Design connections
* [ ] Design HV transfomer
* [ ] Manufacture of the HV Generator
* [ ] Manufacture of the casing
* [ ] Assembly of the casing & connectors & Electronic components
(PCB, HV Transfo, etc.)
#### Plasma Reactor
The tasks concerning the plasma reactor are defined below.
*Add tasks*
* [ ] Design of the Plasma Reactor
* [ ] Include gas input
* [ ] Include gas ouput
* [ ] Include DBD
* [ ] Include HV connection
* [ ] Include Dielectric Barrier
* [ ] Include Ground electrode
* [ ] Include support system
* [ ] Manufacture of the Plasma Reactor
* [ ] Gas system
* [ ] Tubes
* [ ] Tubes connectors
* [ ] Gas adapter (parts used to connect tubes connector to plasma chamber)
* [ ] Reactor system
* [ ] HV Connector - HV DBD electrode
* [ ] Mesh Tube
* [ ] Mesh Connector - Ground electrode
* [ ] Tube
* [ ] Testing the Plasma Reactor
* [ ] Testing the gas system
* [ ] Testing DBD
### Schedule
The schedule includes tasks and their distribution over time.
*Add Schedule*
<table style="undefined;table-layout: fixed; width: 490px"><colgroup><col style="width: 107.2px"><col style="width: 383.2px"></colgroup><thead><tr><th>Week</th><th>Task</th></tr></thead><tbody><tr><td>12</td><td>Design of the PCB (iteration 2)<br>Testing the PCB (iteration 1)</td></tr><tr><td>13</td><td>Manufacturing &amp; Testing PCB (iteration2)<br>Testing HV Generator (iteration 1)</td></tr><tr><td>14</td><td>Testing HV Generator (iteration 2)</td></tr><tr><td>15</td><td>Design Plasma Reactor + Manufacturing Plasma Reactor (iteration 1)</td></tr><tr><td>16</td><td>Testing Plasma Reactor (iteration 1)</td></tr><tr><td>17</td><td>Design Manufacturing Plasma Reactor (iteration 2?)</td></tr><tr><td>18</td><td>Testing Plasma Reactor (iteration 2)</td></tr><tr><td>19</td><td>Testing Plasma Generation (plasma reactor + HV Generator)<br>Presentation Preparation (video)</td></tr><tr><td>20</td><td>Project Presentation</td></tr></tbody></table>
***
## Development
*Work in progress...*
*Work in progress...*
\ No newline at end of file
0% Loading or .
You are about to add 0 people to the discussion. Proceed with caution.
Please register or to comment